Back in December, Winnie decided that we needed to do some major home improvements. To be fair, our house is about 30 years old and needs some upgrades. So our plans were to redo the flooring in our basement den first, along with repainting. Then we’d move up to the main level and replace the old carpeting with wood flooring and be finished by April. Take off the spring and summer for more important boating and outdoor stuff, then replace the upstairs carpeting with wood flooring in the fall and be finished by Christmas 2016.
That was our plan.